What this page will not do
It will not price the load. It will not say a trading partner accepted the invoice. It will not treat a 997 as this send check. It will not calculate a rate variance against the 204. The mismatch queue can still catch that variance, a missing shipper reference, or an AK9 R rejection. The segment check names a segment in text you paste. This page is the send check for one load.
Questions
When does EXSPEEDITE compile an outbound 210?
The documented compile point is after the load delivers and the proof of delivery is imaged. EXSPEEDITE then builds the 210 from the rated load, keeps the B3 invoice number and the shipper BM and PO references, and maps charges to L0, L1, and L7. This page does not say the trading partner has accepted it.
What keeps an incomplete 210 from leaving?
EXSPEEDITE validates that required proof-of-delivery images, accessorial receipts, and partner-mandated qualifiers are present. A missing POD image, missing accessorial receipts, or missing qualifiers keep that incomplete invoice from leaving.