IMO IGF • DNV / BV / ABS MWS COMPLIANT • SPMT RORO LOAD-OUT
Dual-Fuel Marine LNG Tank SPMT RoRo Audit Checklist
Pre-load-out maritime engineering standard for roll-on/roll-off (RoRo) barge operations: ramp transition deflection, ballast pumping rate vs SPMT ground speed, and sea-fastening grillage inspections.
MWS Readiness Score
0%
Pending Inspection
Verified Checkpoints
0 / 12
Class MWS Hold Points
Barge Deck Trim Limit
≤ 0.5° List / Trim
Synchronized Ballast
Load-Out State
HOLD • PRE-RORO AUDIT REQUIRED
01 Quayside Linkspan & Ramp Transition Geometry
02 Barge Ballasting Plan & Tidal Window Management
03 Barge Deck Grillage, Stools & Sea-Fastenings
04 Cryogenic Containment & MWS Final Sign-Off
OFFICIAL CLASS MWS • RORO APPROVAL DOSSIER
Authorize & Transmit RoRo Clearance
Submit completed checklist data to the Exspeedite Heavy Marine Warranty Team for Class MWS certificate generation.