ISO CLASS 1 / FED-STD-209E • WAFFLE-SLAB LOAD-IN • AIR-CASTER RIGGING

Semiconductor Fab Cleanroom Rigging & Load-In Audit

Quality hold points and structural verification for rolling and hoisting 20T to 40T High-NA EUV modules, tracks, and subfab vacuum systems across raised cleanroom pedestal flooring without particulate generation.

Fab Readiness Score
0%
Pending Inspection
Hold Points Cleared
0 / 16
Rigging Steps Verified
Max Floor Point Load
≤ 42.5 kPa
Waffle-Slab Floor Limit: 50 kPa
Cleanroom Ingress Status
HOLD • PRE-LOAD-IN AUDIT
Wafer Fab Facility Director
01

Raised Waffle-Slab & Floor Capacity

02

Air-Caster Pneumatic Transload Gear

03

Cleanroom Airborne Contamination Control

04

Seismic Foundation & Metrology Leveling

Transmit Cleanroom Rigging Audit

Submit this checklist directly to the Exspeedite Semiconductor Logistics Engineering group for final load-in approval.