INL TO KEMMERER NATRIUM • ORNL TO HERMES • NRC 10 CFR 73 CONVOY • BRIDGE STRESS
Oak Ridge & Idaho National Lab to Commercial SMR Demo Site Corridor Guide
Comprehensive transit routing, bridge gross axle rating analysis, railhead heavy sidings, and multi-state police convoy harmonization for advanced fission test and commercial demonstration reactors.
INL Materials & Fuels Complex → Kemmerer Unit 1 Natrium Site
215 MILES • 345 MWe DEMOTransporting TerraPower Natrium liquid sodium pool reactor modules and molten salt thermal storage vessels from Idaho National Laboratory across the Caribou Range into southwestern Wyoming's coal-to-nuclear transition zone.
Rail Transload Hub
UP Pocatello Yard (ID)
Critical Bridge
Bear River Crossing US-30
Haul Platform
20-Axle Dual-Lane Dual-Gooseneck
Security Escort
ISP / WHP Tactical Convoy
Critical Engineering Waypoints & Bridge Protocols
MP 035:
INL Scoville Siding → US-20 / US-26 Southeast Incline
Auxiliary pusher tractor engaged to negotiate lava-bed undulations. Dry N2 bottle pressure logged every 15 minutes.
MP 118:
Pebble Creek Pass Elevation Incline (US-30 Bannock County, ID)
Maximum grade 5.4%. Dynamic driveline retarders and hydraulic assist hubs to maintain continuous forward momentum without thermal brake glazing.
MP 195:
Wyoming State Line → Kemmerer Substation Access Road
Naughton Power Plant heavy haul haul-road transition with 8" compacted road base to sustain 850,000 lb gross combination vehicle footprint.
Request Nuclear Corridor Clearance
Coordinate NRC Category 1 security escorts, bridge stress modeling, and state DOT permits with Exspeedite Nuclear Logistics.
Nuclear Transit Rules:
• Pre-trip NRC 10 CFR 73 communication rehearsal.
• Daylight-only transport with continuous encrypted satellite telemetry.
• Designated DOE / DOD safe havens at 50-mile intervals.