ISO CLASS 7 / 8 CLEANROOM • 1,500T TANDEM CRANE RIGGING • ITER/SPARC QA
Fusion Cryostat Assembly Hall Heavy Rigging & Cleanliness Audit
Pre-rigging engineering hold points for lifting and positioning 1,250-ton tokamak cryostat base components and 440-ton vacuum vessel sub-assemblies into the reactor pit with sub-millimeter precision.
Rigging Safety Score
0%
Pre-Rigging Inspection Required
Hold Points Cleared
0 / 16
Quality Sign-Offs Passed
Crane Synchronization
≤ 0.5% Delta
Dual 750T Hook Load Balance
Lift Authorization
HOLD • QA AUDIT PENDING
Tokamak Chief Rigging Engineer
01
Cleanroom Protocol & Particulate Controls
02
Tandem Crane Synchronization & Rigging Gear
03
Laser Metrology & 3D Photogrammetry
04
Pit Seating, Grouting & Seismic Anchors
Submit Heavy Rigging Audit & Sign-Off
Transmit this assembly hall inspection checklist to the Exspeedite Nuclear Rigging Engineering Command.