ITER / DEMO / SPARC / STEP COMPLIANT • SUPERCONDUCTING MAGNET LOGISTICS

400-Ton Tokamak Poloidal Field Coil Transport Manual

Critical engineering procedures for transporting massive ring-shaped superconducting magnets up to 30 meters in diameter: vacuum-pressure epoxy insulation preservation, multi-file SPMT synchronization, and sub-500 με flexural strain limits.

Coil Outer Diameter
24m – 30m
Planar Circular Ring Grillage
Gross Coil Weight
380T – 450T
Nb3Sn / NbTi CICC Windings
Max Permissible Strain
≤ 500 με
Epoxy Delamination Prevention
Triaxial Shock Limit
< 0.25 G
Real-time Fiber Bragg Grating HUD
01

Superconducting Conductor & Epoxy Integrity

Tokamak Poloidal Field (PF) coils utilize Cable-in-Conduit Conductors (CICC) composed of thousands of brittle niobium-tin (Nb3Sn) or niobium-titanium (NbTi) superconducting strands encased in an incoloy or stainless steel jacket. The conductors are wound and impregnated under vacuum with radiation-hardened epoxy resin.

  • • Micro-Crack Prevention: Tensile or shear strains exceeding 0.05% (500 micro-strain) cause micro-fissures in the resin, degrading electrical breakdown strength (dielectric withstand > 30kV).
  • • Dry Helium Positive Pressure Purge: Continuous internal positive pressure (0.2 to 0.5 bar gauge) of 99.999% pure helium gas maintained across all cooling channels to detect micro-leaks.
  • • Fiber Bragg Grating (FBG) Strain Sensors: Arrays of optical strain gauges embedded along the coil circumference monitored at 100 Hz by the Exspeedite in-cab telemetry hub.
02

Circular Grillage & Multi-File SPMT Array

Due to the extreme diameter (24m to 30m) and relatively low out-of-plane torsional stiffness of the annular coil, transport requires a specialized 30-meter radial steel grillage supported by a multi-file SPMT platform.

  • • Radial Spider Truss Grillage: High-strength structural steel radial beams distribute the 400-ton ring load over 48 articulating elastomer support shoes with spherical bearings.
  • • Multi-File 64-Axle SPMT Platform: Dual or quad-file SPMT modules coupled electronically via optical fiber CAN-bus, providing 360-degree all-wheel steering and crab modes.
  • • Isostatic 3-Point Hydraulic Grouping: Suspension divided into 3 independent hydraulic compensation zones to prevent twisting moments during roadway camber transitions.
03

Dynamic Acceleration & Road Profiling

Road-induced vibrations and inertial loads during transport must be kept strictly below cryogenic superconductor tolerance envelopes.

  • • Maximum Speed Limit: SPMT convoy velocity strictly governed to 4.0 km/h (2.5 mph) on highway sections and 1.5 km/h on gradient transitions.
  • • Laser Profilometer Route Survey: Entire route pre-scanned with mobile LiDAR to mill asphalt bumps exceeding 10mm amplitude.
  • • Hydraulic Active Dampening: SPMT hydraulic accumulators pressurized to attenuate resonant frequencies between 1.5 Hz and 8.0 Hz.
04

Tokamak Assembly Hall Ingress & Docking

Final docking at the Tokamak Building airlock requires cleanroom particulate controls and micro-metric positioning beneath the heavy crane gantry.

  • • Clean Airlock Transition: De-dusting washdown and wheel-wash station prior to entry into ISO Class 8 assembly hall airlocks.
  • • Laser Tracker Metrology Alignment: Leica AT960 laser trackers guide SPMT final resting coordinates within ±1.0mm tolerance.
  • • Tandem Crane Pick Handover: 1,500-ton dual overhead crane synchronized pick from transport grillage to vertical sub-assembly jig.

Engage Fusion Magnet Transport Engineering

Submit your fusion facility coil specifications for custom grillage FEA and transport simulation.