100,000-GAL VERTICAL CRYOGENIC TANK • TANDEM CRANE UPENDING • NFPA 2 SETBACKS
Clean Hydrogen Hub Bulk Storage Cryo-Tank Rigging & Pad Audit
Standardized engineering sign-off for tandem crane offloading, vertical upending, vacuum-perlite annular verification, seismic anchor bolt pre-tensioning, and NFPA 2 hazardous area buffer compliance.
LH2 Bulk Storage Tank Rigging & Foundation Placement Gates
Complete all 15 audit gates prior to detaching the secondary tailing crane and releasing rigging slings.
RIGGING VERIFICATION SCORE
0% (0 / 15 Gates)
Phase 1: Dual Crane Tandem Lift & Vertical Upending
Phase 2: Foundation Ring Beam & Seismic Anchor Pre-Load
Phase 3: NFPA 2 Setback Distances, Annular Vacuum & Electrical Grounding
Submit Clean Hydrogen Cryo-Tank Rigging Audit
Generate the signed heavy lift permit, foundation anchorage certification, and NFPA 2 fire protection authority having jurisdiction (AHJ) submission packet.
Cryo Lift Engineering Telemetry
Empty Tank Tare Weight:
215,000 LBS (107.5 Tons)
Overall Tank Height:
85 ft 6 in Vertical
Tandem Lift Wind Limit:
≤ 12 Knots Gust
Seismic Zone Rating:
ASCE 7-22 Zone 4
Exspeedite Cryo TMS Integration
From manufacturing facility transport on 16-axle perimeter lowboys to quayside crane upending and final NFPA 2 commissioning, Exspeedite coordinates engineering and logistics every foot of the journey.