Grid Intertie Valve Hall Clean-Enclosure Rig-In & Bushing Assembly Audit
Engineering execution protocol for rigging dry-type air-core smoothing reactors, suspended MMC valve tiers, positive-pressure airlock transitions, and oil-to-SF6 wall bushing alignment inside pressurized converter hall enclosures.
Section 1: Valve Hall Environmental Staging & Air Quality
PHASE ISection 2: Thyristor / MMC Valve Tier Suspension & Rig-In
PHASE IISection 3: Wall Bushing, SF6 GIL & Smoothing Reactor Alignment
PHASE IIIRequest UHVDC Rigging Engineers
Deploy Exspeedite certified superload rigging directors and laser metrology crews for converter station hall staging.
UHVDC Converter Hall Rig-In Specifications & Grounding Protocols
High-Voltage Smoothing Reactor Eddy Elimination
Dry-type air-core reactors produce intense stray AC/DC magnetic fields. The foundation reinforcing cage must employ non-magnetic stainless steel rebar (AISI 316) or fiber-reinforced polymer (FRP) with electrical break joints to avoid magnetic induction loop fires. Exspeedite tracks anchor clearances and non-magnetic crane rigging slings to eliminate field distortion during set-down.
Wall Bushing Clean Insertion Protocol
The wall bushing connects the outdoor transformer yards directly to the indoor valve quadrivalve tiers through pressurized composite walls. Bushings weighing up to 28 tons must be tilted at a 30-degree incline and pushed through the seismic wall collar with laser theodolite crosshairs aligned to ±0.05°, followed immediately by SF6 containment gas pressurization.